H315~H355总装线主要工艺流程:
1).机座、定子搬运上线············(3.1)
2).定子压装·················(3.2)
3).钻顶丝孔·················(3.3)
4).电机出线接线···············(3.4)
5).电机顶升回转90°·············(3.5)
6).吹尘工位·················(3.6)
7).穿转子··················(3.7)
8).轴承与端盖压装··············(3.8)
9).电机试验区测试工位(隔音房)·······(3.9)
10).安装接线盒盖、钉铭牌、电机上涂装线···(3.10)
11).工装板回流上线·············(3.11)